Construction of the “SkyHub” in Heidelberg’s Bahnstadt district is progressing rapidly. Since the groundbreaking ceremony last summer, the concrete stair towers have largely been completed, and the steel components are currently being installed. As the general contractor, Goldbeck GmbH is realizing the “SkyHub” mobility hub on behalf of SkyHub Property SCS. Across 14 half-levels, the facility will provide 775 parking spaces, charging stations for e-bikes and electric cars, rental stations for bicycles and e-scooters, car-sharing services, and ticket machines for the adjacent public transport network. It will be an important element of connected, sustainable mobility in the Bahnstadt district.
We at BFK architekten design, plan and deliver projects in the fields of office and commercial buildings, public-sector buildings, hotels, residential construction, production facilities and logistics properties.
10/2026 | BFK architekten at DIA SPONA Sarajevo
More than 300 exhibition panels from international architecture firms are currently on display at Sarajevo Railway Station. Selected projects by BFK architekten are also part of the DIA SPONA exhibition.
We are delighted to be represented in Sarajevo and to have the opportunity to present our work to an international audience.
10/2026 |Construction Begins on the Nürtingen Diakonie Centre
Initial construction work has begun on the new Diakonie Centre at the historic slaughterhouse site in Nürtingen. The former building used by a food-service wholesaler has already been demolished.
The new building will house a Diakonie shop, counselling facilities, and offices for the Esslingen District Diakonie Association.
04/2026 | Topping-out ceremony for the extension of the Ehingen an der Donau fire station
On 24 April 2026, the topping-out ceremony for the extension of the fire station in Ehingen an der Donau was held. Featuring modern operational and functional areas, as well as social and training facilities, the new building strengthens the capabilities of the Ehingen fire service. We are delighted to continue supporting this forward-looking project and to contribute to the architectural quality of modern fire and emergency response infrastructure.
Photo: Sven Koukal
03/2026 | Topping-Out Ceremony for the New DRK Center in Waiblingen
On March 24, 2026, the topping-out ceremony was held for the new DRK rescue station and district office with an integrated control center. With the shell construction now complete, the new DRK Center opposite the Rundsporthalle is already taking shape.
This milestone was made possible through the collaboration of numerous parties, including the DRK, the district administration, the integrated control center, the general contractor Peter Gross Bau, and all planning participants, tradespeople, and construction workers.
Photo: Bebop Media / DG
02/2026 | Construction Progress at SkyHub Heidelberg
12/2025 | Award Ceremony Beispielhaftes Bauen Rems-Murr-Kreis
The STIHL Brand World was honored with the distinction “Beispielhaftes Bauen Rems-Murr Kreis” at a formal award ceremony. We would like to thank ANDREAS STIHL AG & Co. KG as the client, as well as all the planners and partners involved, whose dedication contributed greatly to the project’s successful realization. Together, we created a place that brings the STIHL brand to life in an impressive way while also setting a benchmark for exemplary architecture.
Photo: Jan Potente
10/2025 | Key handover at the new Esslingen district office
A celebratory moment at Pulverwiesen: on 24 October 2025, the symbolic key to the new Esslingen District Office was ceremonially handed over by general contractor ZÜBLIN to District Administrator Marcel Musolf.
In the coming weeks, approximately 675 employees will move into their new offices, and the new public areas of the building will be opened for use.
10/2025 | Groundbreaking ceremony for the new primary and lower secondary school in Windischeschenbach
On 15 October 2025, a ceremonial groundbreaking marked the official start of construction of the new primary and lower secondary school in Windischeschenbach. This is a significant step that will create space for new and modern facilities, as well as a school that meets the educational, spatial and energy-related requirements of the coming decades. The client is the City of Windischeschenbach, which is investing in the future of education while also sending a strong signal in support of the appeal of its school location. As part of a joint venture with .atelier coa, BFK architekten was commissioned with the planning and realization of the new building.
21/09/2025 | First place at the 2025 ArchiCup Mannheim–Heidelberg
Our winning team — consisting of BFK architekten, Werkstadt Fischer Architekten and Skylabs DC — successfully defended its title at this year’s ArchiCup in Heidelberg. We are already looking forward to next year.
20/09/2025 | Handover of the New School Center Stockbrünnele in Böblingen
On Saturday, after four years of intensive planning and construction, the new Stockbrünnele School Center in Böblingen was officially handed over to the Friedrich Schiller Secondary School and the Theodor Heuss Intermediate Secondary School. With state-of-the-art facilities and an open learning environment, the new school center provides ideal conditions for learning, growing, and developing together. Our sincere thanks go to the City of Böblingen as the client, WOLFRAM GmbH & Co. KG as the client representative, the general contractors Geiger Schlüsselfertigbau GmbH & Co. KG and müllerblaustein HolzBauWerke GmbH, as well as all specialist planners involved in the project and the schools’ user representatives. We wish all the students a future filled with curiosity, learning, and community in their new school center.
09/2025 | Successful Handover of the New Esslingen District Office Building
It has been five years, eleven months, and nine days since we received the first invitation to participate in the architectural competition. After years of intensive planning and construction, the new Esslingen District Office was successfully handed over to the client on September 4, 2025.
07/2025 | Summer Party at Mörikehof
What a wonderful evening! Together with SPACE4, we organized our joint welcome summer party and celebrated with our neighbors at Mörikehof. Best of all, the weather was perfect — plenty of sunshine and a fantastic atmosphere!
07/2025 | Award Beispielhaftes Bauen Rems-Murr-Kreis for the STIHL Brand World
We are delighted that the STIHL Brand World in Waiblingen has received the award Beispielhaftes Bauen Rems-Murr-Kreis. The award, presented by the Rems-Murr District Office in cooperation with the Architektenkammer Baden-Württemberg, recognizes outstanding architecture and urban design in our everyday surroundings that make a positive contribution to people’s well-being and coexistence.
The final work is currently underway on the innovative hybrid timber building, which will soon house the Friedrich Schiller Secondary School and the Theodor Heuss Intermediate Secondary School. Inside the building, flooring, installations, and furniture assembly are progressing rapidly.
The move from the current school locations will take place during the summer holidays. The installation of the wayfinding system and the final furnishing of the new rooms are also scheduled for this period. Classes are expected to begin at the new location at the start of the 2025/26 school year.
07/2025 | Groundbreaking Ceremony for the “SkyHub” Mobility Hub in Heidelberg
The ceremonial groundbreaking marks the start of construction on the “SkyHub” mobility hub in Heidelberg’s Bahnstadt district. Together with SkyHub Property SCS as the client and Goldbeck GmbH, responsible for the parking facility’s system planning and construction as the general contractor, BFK architekten will continue to support the project through its scheduled completion in 2026. BFK architekten is responsible for the façade design, project management, and general contractor supervision.
The construction of SkyHub marks an important step toward an intelligently connected and sustainable urban mobility infrastructure.
Photo: Thilo Ross Fotografie
05/2025 | Groundbreaking and Start of Construction for the DRK Rescue Station in Waiblingen
On May 6, 2025, construction of the DRK rescue station in Waiblingen officially began with a ceremonial groundbreaking. Over the coming months, a new facility will be built on Beinsteiner Straße, immediately next to the B14 access road. The project will include the new DRK headquarters, the rescue station and its vehicle fleet, as well as a separate building for the integrated control center.
In collaboration with Peter Gross Hochbau GmbH & Co. KG as the general contractor, the DRK rescue station is scheduled for completion within the next two years.
03/2025 | Competitonline Ranking 2024
BFK architekten ranked 16th in competitionline’s ranking. The ranking places are determined based on competition results among approximately 21,400 architecture firms in Germany.
12/2024 | Commendation for the Carlo Schmid Grammar School in Tübingen
In the competition for the extension of the Carlo Schmid Gymnasium, our design received an honorable mention.
The building occupies a central position within the existing school campus in Tübingen. To create a more cohesive architectural appearance amid the surrounding buildings, which were constructed in different phases, the new building was designed with a simple, square layout.
11/2024 | Second Prize for the Replacement Building of Hainberg Grammar School in Göttingen
We are delighted to have won second prize, together with .atelier coa and Möhrle + Partner Landschaftsarchitekten, in the competition for the replacement building of Hainberg Gymnasium in Göttingen.


























