BFK Architekten prepared an urban planning study for the western “STEP” development area in Stuttgart-Vaihingen.

The plans called for a total of five buildings, all based on the same design concept. Each floor is organized around a central, multi-story staircase hall and contains up to four rental units. Their flexible sizes allow for rental spaces ranging from approximately 100 to 1,000 square meters.

The first building, “STEP 8.1,” was completed in 2008.

The building is highly articulated, responding to the constraints imposed by the existing buildings and the pedestrian connection to the adjacent Gropiusplatz. This central square within the “STEP” development, with its “stone-like” character, is complemented by the appealing terraced landscaped area of “STEP 8.1.” The façade design, featuring window bands of varying lengths and light-colored rendered surfaces, follows the sculptural concept of the overall design.

ProjectOffice Builduing STEP

LocationStuttgart-Vaihingen

ClientSTEP Stuttgarter Engineering Park GmbH

StatusCompleted in 2018

BGF37.725 m²

Baukosten60 Mio. € netto

GeneralplanungBFK plan

Photography© Hangar 11
© Dietmar Strauß
© BFK Architekten

DGNB-Gold 2018ArchitekturSÜD 2015/2016