Maximum Flexibility for the Industry of the Future
The LIZ is being developed on the former Mann+Hummel site as a forward-looking Industry 4.0 campus. The campus provides ideal conditions for production, research, development, and management—flexible, sustainable, and connected to the urban environment. LIZ combines all elements of the industrial value chain within a modular system. Production and storage areas, laboratories, offices, and third places can be combined according to individual needs. The vertical organization across two levels, together with the ability to subdivide the spaces flexibly, accommodates a wide range of uses.
ProjectLIZ - Ludwigsburg Industriezentrum
LocationSchlieffenstr./Groenerstr./Wilhelm-Fein-Str. Ludwigsburg
ClientPatron Lyndon S.à.r.l.
Statusunder construction
BGFNew build C1-C3: ca. 52.000 m² | BRINew build C1-C3: ca. 285.000 m³ |
Service phases1-8 | GeneralplanungBFK plan |
Urban Design
To create a future-oriented campus, the existing buildings in Clusters 1 to 3 will be demolished and replaced by halls with office floors above them. The historic sawtooth-roof halls in Cluster 4, which are considered worthy of preservation, will be integrated into the overall campus concept. Their materials and forms are deliberately echoed in the new buildings, giving the entire campus a distinctive architectural character.
The central design concept is the vertical organization of the site across two levels. Spacious industrial halls are located on the lower level, while the upper floors accommodate research and office spaces. The two levels are connected by an intermediate level arranged above the hall roofs. This creates an interconnected and vibrant campus district that combines the existing Mann+Hummel buildings with the new clusters and provides pedestrian access to the office floors. The parking facility consists of a public above-ground multi-storey car park for passenger vehicles and a non-public underground garage for delivery vehicles. Bicycle parking is provided both in the car park and at decentralized locations outside the building entrances. The existing sawtooth-roof halls in Cluster 4 will be integrated into the overall campus concept.
LIZ focuses on revitalizing existing inner-city sites and combines contemporary architecture with the highest sustainability standards. The project is being planned in accordance with the German KfW Efficiency House 40 standard, and DGNB Gold certification is being sought for the new TP1 building. Photovoltaic systems, the use of green electricity, and connection to the district heating network underline the project’s ecological ambitions. Solid-construction halls and office spaces built using timber and hybrid construction combine functionality with sustainability. The façades of the upper floors are designed with a balanced proportion of glazing and solid metal surfaces. The metal cladding is low-maintenance and references the industrial character of the site through its materiality. Spacious courtyards, open structures, and a clearly defined central plaza create a modern working environment with a high quality of stay.
Further information: www.liz-ludwigsburg.de






