Logistics Center with Office Building

The new logistics facility comprises a warehouse with two hall sections and an adjoining three-story office building.

Staff facilities and building-services rooms are integrated into the warehouse area as built-in units. Office and administrative spaces, the reception area, and a break room are located in the adjoining office building. The sprinkler system room and sprinkler tank are housed in separate external structures at the southwest corner of the building.

Loading and unloading take place via dock levellers in the lowered service yard and through ground-level warehouse doors.

The warehouse façades consist of exposed-concrete sandwich panels and light-colored insulated panels. The office building features a prefabricated aluminum curtain wall with large windows, creating bright and welcoming workspaces.

All roof surfaces are extensively planted. Part of the roof drainage is directed into infiltration basins located to the west of the site.

ProjectLogistics Center with Office Building

LocationDornstadt

StatusCompleted in 2017

BGFHallen: 22.400 m²
Büro: 1.480 m²

Service phases1-8

GeneralplanungBFK plan

Photography © Uwe Gnass