Alnatura Logistics Center
The Alnatura Logistics Center in Lorsch consists of a logistics hall covering approximately 20,800 m², a 650 m² two-story office building, a 9,360 m² high-bay warehouse, and a 120 m² quarantine warehouse.
The project was completed in two construction phases. The administration building, storage areas, and order-picking hall are arranged to keep travel distances between the various areas as short as possible while ensuring that future extensions will not disrupt operations. Added during the second construction phase, the high-bay warehouse provides approximately 25,000 pallet spaces and accommodates the entire reserve stock for the order-picking hall.
ProjectAlnatura Logistics Center Lorsch
LocationGewerbegebiet Lorsch
Statusfertiggestellt 2014
BGF31.510 m² |
Baukosten13.25 Mio. € netto
Service phases1-5 |
Photography© Norman A. Müller, Ingolstadt
© BFK Architekten
In keeping with Alnatura’s commitment to sustainability, the following measures were implemented:
- The façades and the structural framework are made of timber-based materials.
- The high-bay warehouse features the world’s largest racking structure built entirely from wood.
- The order-picking hall is heated and cooled using an air-source heat pump.
- The office building is heated using geothermal energy.
- A photovoltaic system is installed on the roof of the hall.
The second construction phase was completed in collaboration with Swisslog AG.