DAIMLER Office V
A modern office complex comprising four buildings has been developed for Daimler AG in the “Synergiepark” industrial district in Stuttgart-Vaihingen.
The office complex was constructed by Ed. Züblin AG, Stuttgart Division, acting as the general building contractor in a joint venture with Dobler, which served as the general façade contractor. BFK Architekten was commissioned to prepare the construction documentation for the office floors and parts of the underground garage, based on the design by Ortner Ortner Baukunst Architekten from Berlin.
ProjectDAIMLER Office V
LocationStuttgart-Vaihingen
ClientDAIMLER AG
Statusfertiggestellt 2021
BGFca. 166.000 m² | BRIca. 650.000 m³ |
Service phases5 |
PhotographyBrigida González
Each building has five upper floors containing office space, as well as a ground floor with a foyer, circulation areas, conference rooms, and dining facilities. In addition to other service functions, the complex also includes a day-care center. Sufficient parking spaces for employees are provided in the shared two- to three-level underground garage.
The buildings were designed in accordance with Daimler AG’s functional requirements for its “New Office Structure.” Four office modules, each representing the smallest spatial unit, are grouped together with a central infrastructure module to form an “H.” A podium level accommodating the special-use areas connects the H-module at ground-floor level and presents it as an independent urban building volume.